Construction estimating & quantity takeoffs · NationwideSend the plans. Get the numbers.
Quantity takeoffs and cost estimates for general contractors, subcontractors and builders anywhere in the U.S. Residential, commercial and industrial work, across the trades, measured from the plans you upload.
Measured in PlanSwift · Field-reviewed · PDF · DWG · ZIP
Six ways to get a number
From one trade’s quantities to a full-project estimate or an early budget. Every one starts the same way: your plans.
- QT-01
Quantity takeoffs
Counts, lengths, areas and volumes measured from your drawings and organized by trade, ready for you to price with your own costs.
- RE-02
Residential estimating
Estimates for single-family homes, additions and remodels, from foundation to finishes, for builders, remodelers and trade contractors.
- CE-03
Commercial estimating
Estimates for commercial buildings and tenant improvements, organized the way GCs and subs bid them.
- IE-04
Industrial estimating
Estimates for warehouses, manufacturing buildings and other industrial work, where slabs, steel and site work drive the number.
- PE-05
Preliminary estimates
Early budget numbers from concept or schematic drawings, with the assumptions spelled out, so you can decide whether to go further.
- EC-06
Estimating consultant
Estimating help when you need it: extra hands for a busy bid season, or a second look at a number before it goes out.
Across the trades
Takeoffs for a single trade’s scope, or every trade on the plans in one estimate. Organized by CSI division or by your bid form.
- Div 31–33
Sitework
Earthwork, paving and site utilities, when shown on the civil sheets.
- Div 03
Concrete
Foundations, slabs on grade and walls, measured as volumes and areas.
- Div 05
Structural steel
Beams, columns, platforms, ladders and grating.
- Div 06
Framing
Wall, floor and roof framing for residential and light commercial work.
- Div 07
Roofing
Roof areas, with the edge and flashing lengths that go with them.
- Div 09 / 12
Finishes
Countertops, cabinets and millwork, tile and flooring.
- Div 22
Plumbing
Fixtures and piping runs.
- Div 23
Mechanical & HVAC
Equipment, ductwork and piping.
- Div 26
Electrical
Devices, fixtures and power distribution.
- Other divisions
Another trade?
Upload the plans and name the trade in the form. Full-project estimates cover every trade on the plans.
Checked by someone who has built it
A plan sheet shows what to build. It does not always show what it takes. That is why takeoffs are reviewed by someone who has built the work, not only measured it, before they go out.
- Measured
- Quantities are measured from your drawings in PlanSwift and organized by trade, CSI division or your bid form.
- Reviewed
- Before delivery, the takeoff is checked by someone with field experience for what the drawings imply but do not show.
- Written down
- Assumptions and exclusions are listed, so you can see what the number rests on.
Built for the people who bid
General contractors
A full-project estimate to bid from, or quantities to check and level sub bids before bid day.
Subcontractors
Takeoffs for your trade’s scope, organized to your bid form, so you can price with your own costs.
Builders & developers
Residential and commercial estimates, and early budget numbers when you need to know whether a job pencils out.
Plans in. Numbers out.
Four steps, and you approve the price before anything is measured.
Upload
Send your plans, specs and a note on scope through the upload form. PDF, DWG or ZIP.
Review & quote
The plan set is checked for scope and missing sheets. You get questions, a price and a delivery date.
Measure & estimate
Once you approve the quote, quantities are measured from the drawings in PlanSwift and the estimate is built.
Review & deliver
Takeoffs are reviewed by someone who has built the work, then delivered with assumptions and exclusions written down. Follow-up questions are answered.
Real work goes here
These slots are held for real client quotes, sample takeoffs and numbers. Nothing is shown until it is confirmed.
Before you upload
Which trades do you estimate?
General construction across the trades: sitework, concrete, structural steel, framing, roofing, plumbing, mechanical and HVAC, electrical, and finishes such as countertops, cabinets, tile and flooring. Full-project estimates cover every trade on the plans. For a trade not listed, name it in the upload form.
What files can I upload?
PDF, DWG or ZIP. You can attach several files at once, up to 50 MB each and 100 MB in total. For larger plan sets, compress them into a ZIP or paste a download link (Dropbox, Google Drive, Box or similar) in the plans-link field.
Do you work in my state?
Yes. NT Estimating works remotely for contractors anywhere in the United States. Everything happens from your plans, so your project's location does not matter.